What preparing work we should do before installing PVC flooring?

What preparing work we should do before installing PVC flooring?

1. Using the thermometer to measure the degree of temperature and moisture. 15℃ is suitable for interior room and concrete floor. It is forbidden to install PVC Flooring at low 5℃ and above 30℃. The moisture degree is from 20%-75%.

2. Using water content testing instrument to measure the moisture content.the moisture content of basic layer should be lower 3%.

3. About the PVC material installation, in 2 meters range, the concrete floor need to be flat, the allowable error has to be lower 2mm.


Post time: Oct-12-2015